The production of a chemical compound requires a curation period of 5.5 hours

| August 31, 2017

Question
The production of a chemical compound requires a curation period of 5.5 hours +/-.5 hours, a speed of 130 rpm +/- 20 rpm to obtain an acceptable product. If we want to know with a 95% confidence level, if these variables affect the production yield, then a multiple linear regression analysis need to be done.

.0/msohtmlclip1/01/clip_image001.png”>

Determine the slope of the line for the Curing time:____________________

Determine the slope of the line for the Rpm: _________________________

Determine the Y intersection:__________________

Determine the Determination Coefficient:_____________________

Based on the R2 value: what conclusion should be taken:

Strong linear relationship with a positive slope

Strong linear relationship

No linear relationship

None of the above

Determine the Experimental Value of F: _______________

Determine the Critical Value of F: ________________

Based on the ANOVA: what conclusion should be taken:

Strong linear relationship with a positive slope

Strong linear relationship

No linear relationship

None of the above

Get a 30 % discount on an order above $ 5
Use the following coupon code:
CHRISTMAS
Order your essay today and save 30% with the discount code: CHRISTMASOrder Now
Positive SSL