Required:- 1. Create a Work Breakdown Structure (WBS) for the project. As a guide the WBS should contain between 60 and 75 activities. Do not exceed 80 task-level activities. Present the WBS in a hierarchical structure diagram. (5 marks) 2. Create a schedule for the project. Determine the overall duration and when activities and events are planned to happen. The schedule is to include activities and their logical dependencies, with estimations of activity durations. Use the summary tasks, …

| February 7, 2018

Required:- 1. Create a Work Breakdown Structure (WBS) for the project. As a guide the WBS should contain between 60 and 75 activities. Do not exceed 80 task-level activities. Present the WBS in a hierarchical structure diagram. (5 marks) 2. Create a schedule for the project. Determine the overall duration and when activities and events are planned to happen. The schedule is to include activities and their logical dependencies, with estimations of activity durations. Use the summary tasks, …

Order your essay today and save 30% with the discount code: ESSAYHELP
Order your essay today and save 30% with the discount code: ESSAYHELPOrder Now