Complete an MRP matrix for the file cabinet using: (a) L4L, (b) EOQ, and (c) POQ lot

| October 3, 2018

Files and More, Inc. (F&M), a manufacturer of office equipment, uses MRP to schedule its production. Because of the current recession and the need to cut costs, F&M has targeted inventory as a prime area for cost reduction. However, the company does not want to reduce its customer service level in the process. Demand and inventory data for a two-drawer file cabinet are given in the following table. Complete an MRP matrix for the file cabinet using: (a) L4L, (b) EOQ, and (c) POQ lot sizing. Which lot-sizing rule do you recommend?Period12345Demand2040301045Ordering cost = $100 per orderHolding cost = $1 per cabinet per periodLead time = 1 periodBeginning inventory = 25